Condamine Weir Project

DJI_0164-1.jpg

Council is delivering upgrades to the Condamine Weir and Fish Ladder, enhancing local water storage capacity, improving long term water security, and supporting continued economic growth efforts.

Weir Upgrades

The upgrades to the Condamine Weir are set to increase impoundment capacity upstream. This will see an increase in height by 0.5 m and width by approximately 20 m.

Crawford Bridge

The upgrades will see works undertaken to improve scour protection to the Transport of Main Roads (TMR) Crawford Bridge.

Fish Ladder

The proposed fishway at Condamine Town Weir is designed to restore ecological connectivity along the Condamine River by facilitating both upstream and downstream passage for a wide range of native fish species.

Project Progress

Underway

  • Development approval application
  • Water licence amendment 

Completed 

  • IFC design
  • Pre-lodgement advice and meetings
  • Site survey
  • Hydraulic and hydrological modelling
  • Hydraulic Impact Assessment (HIA) report